delete
Get in touch

5 steps

FOR A FAST, EASY AND SAFE
INSTALLATION

step01
1
Realisation of the hole or the excavation
for the installation of the upper box, to run in the
first case
by drill and tip, in the second
by excavator bucket.

 

step02
2
Installation of the ATLUX device into the hole
or excavation, prepared in the previous step
,
through a special mounting plate, provided by
Atlantech, to attach to the drill.
step03
3

Placing and fixing of the cast iron frameon the
box
ATLUX,
insertion of the corrugated conduit
into the holes and backfilling corrugated
track.

step04
4

Installation of the lighting pole into the Atlantech
Lux box, use of sand to fix and adjust the verticality,
and final electrical connections. Seal using mortars
hardening resins of thick 5/10 cm around the base
of the pole up to the level of the manhole

SWITCH
ON A NEW ERA
IN THE WORLD
OF LIGHTING
SYSTEMS

Stop to large construction sites, to escavations
and to the use of concrete. Choose Atlantech
for easy, rapid and safe works. In the respect
of the environment.

Contact us without obbligation, we will send you project specifications,
complete datasheets and products DWG.

This website uses third party cookies exclusively to collect analytics data. If you continue browsing or close this notice, you will accept their use.
To know more about it read our privacy policy and cookie policy.
You allowed the use of cookies